Advertisement
|
|
2006-03-05 |
Looking east on the future David Ave. from the intersection with Pipeline Road.
Three single family dwellings can be seen to the left of the David Ave. construction site. These dwellings previously obtained access from other streets and did not require access from David Ave. Concrete fencing has been installed on both sides of the new street which will provide a sound and visual barrier from traffic. |
|
|
|
|
|
Online Subscription Service
|
|
|
Advertisement
|